The Three-Pillar Ecosystem workflow outlines three sequential steps: Capital Mobilization by Joshua Energy via tokenized contracts starting Q4 2025 ICO, Technology & IP Development by Alphatech over 1-3 years, and Infrastructure Deployment by EQORE from 3-5 years onward. Each pillar lists key roles like RWA-backed liquidity, methane pyrolysis tech, and facility operations with biofuels to energy transition.
Three-Pillar Ecosystem
{ "headers": [ "Step", "Pillar", "Key Roles", "Timeline" ], "rows": [ [ "1. Capital Mobilization", "Joshua Energy", "Tokenized energy contracts, dual-buyer market, RWA-backed liquidity", "Q4 2025 ICO Launch - Ongoing" ], [ "2. Technology & IP Development", "Alphatech", "Methane pyrolysis tech, distributed reactors, nuclear IP", "1-3 Years (Phase 1-2)" ], [ "3. Infrastructure Deployment", "EQORE", "Build/operate facilities, biofuels to advanced energy transition", "3-5 Years+ (Pilots to Scale)" ] ] }
Source: Joshua Energy Pitch Deck - Slide 4
Speaker Notes
Diagram illustrating the three pillars: Joshua Energy (capital engine), Alphatech (tech & IP), EQORE (infrastructure ops). Emphasize key roles, synergies, and timelines for investor confidence in the ecosystem.