On-Time, High-Quality NPI Rack Hardware

Generated from prompt:

Objective 1: Deliver NPI rack hardware on time with high quality and minimal rework Why: Speed matters, but not at the expense of stability or downstream churn. Key Results: Launch 100% of NPI rack programs aligned to committed build schedules (EVT/DVT/PVT → MP). Achieve ≤2 critical hardware re-spins per NPI program. Reduce post-release rack HW ECOs by 30% compared to prior NPI cycles. Complete design freeze on or before target date for all NPI rack assemblies.

Deliver NPI rack hardware on schedule with top quality: 100% on-time launches (EVT/DVT/PVT→MP), ≤2 re-spins/program, 30% fewer post-release ECOs, on-time design freezes. Execute with quality for stabi

February 6, 20266 slides
Slide 1 of 6

Slide 1 - Objective 1: On-Time High-Quality NPI Rack Hardware

The slide presents Objective 1, focused on delivering on-time, high-quality NPI rack hardware. It emphasizes minimizing rework by prioritizing stability over speed.

Objective 1: On-Time High-Quality NPI Rack Hardware

Deliver with minimal rework, prioritizing stability over speed

Source: NPI Rack Hardware Delivery

Speaker Notes
Deliver NPI rack hardware on time with high quality and minimal rework. Speed matters, but not at the expense of stability or downstream churn. Key Results: 100% on-schedule launches, ≤2 re-spins, 30% fewer ECOs, on-time design freezes.
Slide 1 - Objective 1: On-Time High-Quality NPI Rack Hardware
Slide 2 of 6

Slide 2 - Why This Objective Matters

This section header slide, titled "Why This Objective Matters," emphasizes the importance of the objective in section 01. It highlights that while speed is crucial, quality is essential to avoid stability issues and costly rework.

Why This Objective Matters

01

Objective Importance

Speed matters, but quality prevents stability issues and rework churn

Source: Objective 1: Deliver NPI rack hardware on time with high quality and minimal rework

Speaker Notes
Speed is critical, but quality ensures stability and minimizes downstream churn from rework. Key Results: Launch 100% of NPI rack programs aligned to committed build schedules (EVT/DVT/PVT → MP). Achieve ≤2 critical hardware re-spins per NPI program. Reduce post-release rack HW ECOs by 30% compared to prior NPI cycles. Complete design freeze on or before target date for all NPI rack assemblies.
Slide 2 - Why This Objective Matters
Slide 3 of 6

Slide 3 - Key Results

The slide outlines key NPI rack program results, including 100% launches on committed build schedules from EVT/DVT/PVT to MP, achieving ≤2 critical hardware re-spins per program, and completing design freeze on or before target dates. It also highlights a 30% reduction in post-release rack HW ECOs compared to prior cycles.

Key Results

  • Launch 100% NPI rack programs on committed build schedules (EVT/DVT/PVT → MP)
  • Achieve ≤2 critical hardware re-spins per NPI program
  • Reduce post-release rack HW ECOs by 30% vs prior cycles
  • Complete design freeze on or before target date for all NPI racks

Source: Objective 1: Deliver NPI rack hardware on time with high quality and minimal rework

Speaker Notes
Speed matters, but not at the expense of stability or downstream churn.
Slide 3 - Key Results
Slide 4 of 6

Slide 4 - Measurable Targets

The slide "Measurable Targets" outlines key performance stats for NPI rack programs, including 100% on-schedule launches, design freeze on time for all assemblies, ≤2 re-spins per program for critical hardware, and a 30% reduction in post-release ECOs for rack hardware. These metrics emphasize efficiency and reliability in hardware development and deployment.

Measurable Targets

  • 100%: On-Schedule Launches
  • All NPI rack programs on time

  • ≤2: Re-Spins per Program
  • Critical hardware re-spins

  • 30%: ECO Reduction
  • Post-release rack HW

  • 100%: Design Freeze on Time

All NPI rack assemblies Source: Objective 1: Deliver NPI rack hardware on time with high quality and minimal rework

Speaker Notes
Speed matters, but not at the expense of stability or downstream churn.
Slide 4 - Measurable Targets
Slide 5 of 6

Slide 5 - NPI Program Timeline

The NPI Program Timeline outlines four key phases: EVT (4-6 weeks, owned by Hardware Lead) for prototype build and initial validation; DVT (6-8 weeks, Engineering Mgr) for design verification and fixes; PVT (4-6 weeks, Operations Lead) for pilot production and process validation; and MP (ongoing, Program Mgr) for mass production with limited re-spins. This workflow ensures structured progression from design freeze preparation to full-scale manufacturing readiness.

NPI Program Timeline

Source: EVT → DVT → PVT → MP: Align all programs to committed schedules with design freeze milestone.

Speaker Notes
Objective: Deliver NPI rack hardware on time with high quality and minimal rework. Why: Speed matters, but not at the expense of stability or downstream churn. Key Results: 100% alignment to schedules, ≤2 critical re-spins, 30% reduction in post-release ECOs, design freeze on time.
Slide 5 - NPI Program Timeline
Slide 6 of 6

Slide 6 - Path to Success

The slide "Path to Success" emphasizes executing with quality by achieving 100% on-time launches, ≤2 re-spins, 30% fewer ECOs, and on-time design freezes, prioritizing stability over speed. It calls for committing to excellence to reduce rework and deliver stable racks.

Path to Success

**Execute with Quality.

Hit KRs: 100% on-time launches, ≤2 re-spins, 30% fewer ECOs, on-time design freezes.

Speed matters, stability first.**

Commit to excellence – reduce rework, deliver stable racks.

Source: Objective 1: Deliver NPI rack hardware on time with high quality and minimal rework

Speaker Notes
Emphasize quality execution for stable delivery, hitting all KRs without compromising speed for stability.
Slide 6 - Path to Success

Discover More Presentations

Explore thousands of AI-generated presentations for inspiration

Browse Presentations
Powered by AI

Create Your Own Presentation

Generate professional presentations in seconds with Karaf's AI. Customize this presentation or start from scratch.

Create New Presentation

Powered by Karaf.ai — AI-Powered Presentation Generator